国产在线激情视频一区-无码一区二区三区视频在线-大胆国模一区二区三区-视频一区二区三区中文字幕在线

NEWS
more>CONTACT US
LATEST NEWSHome >
April 2018 Reach (Beijing) Technology Co., Ltd. won the bidding of the second phase project for Zhengzhou Metro line 2
發布時間:2019-12-18

Zhengzhou metro line 2 project starts at Tianshan road of Huiji district and ends at Longhu town, via Kaiyuan road, Zheng hua road, Garden road, Bauhinia mountain road, Huazhai road, Taishan road, and commercial road.The total length of the line is about 40.18km. There are 27 stations on the whole line, and the control center is located in the building of Zhengzhou rail transit control center.The first phase of the project was carried out from the broadcasting station to the south fourth ring road station, with the length of 20.649km, and all of the 16 stations are underground (among them, the Bauhinia mountain station and line 1 are implemented synchronously).The second phase of the 16 stations of Zhengzhou metro line 2 project is running east-west, from Tianshan road station in the north to Liuzhuang station in the south.

After the incentive competition, our company won the bidding and became the supplier of automatic ticket checking gate for the second phase project of Zhengzhou metro line 2.