国产在线激情视频一区-无码一区二区三区视频在线-大胆国模一区二区三区-视频一区二区三区中文字幕在线

NEWS
more>CONTACT US
LATEST NEWSHome >
October, 2012 Rich Technology won the bidding of Haerbin subway line 1project
發布時間:2015-03-30

October, 2012 Rich Technology won the bidding of Haerbin subway line 1project.

Subway line 1 in Haerbin has been the first line under construction planed in Ten Line One Ring. The overall length of line 1 is 27.3 km with 25 stations, starts from Huagong road, go through Hadong Station, Taiping bridge, Dongxidazhi street, Hanan station and Xinjiang street. The first and second phases of line 1 from Hadong station to Hanan station is 17.73 km with 18 stations.

It estimates that subway line 1 will be used in the end of 2012 after the first and second phases set up. It carries 17.8 thousand each hour, 275 thousand each day, also reduces the traffic pressure.

We provide speed gate for line 1 as the most comfortable access control system. our gate is widely used in subways, with the function of low power consumption, noiseless running, special design for the handicapped, integrated checking system and kinds of calculating ways.